While the wall was down I replaced the the electrics with better wiring and fixing the back boxes.I put the back boxes so they stuck out a bit so that marking the plasterboards is easier. The wiring was fixed against the studs to prevent overheating.
Monday, 20 October 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment