Thursday 30 October 2008

Final details




I put some foil behind the radiator to reflect radiant heat rather than warming the wall. Also a small shelf to stop the heat going behind the curtains (in the long run we will put up thicker lined curtains). The final expense was laying a thick wool carpet with a decent underlay. While this only has a small effect on the overall insulation it does make it feel a lot warmer underfoot.

The room is now complete and as I said it will take years to cover the costs it does make a huge difference so the room never feels as cold as it used to so it will get used more often. And as someone once said to me how long does it take for a new kitchen to pay for itself.

Wednesday 22 October 2008

Views of the underfloor



You can get some idea of the underfloor form this photo but it's not the easiest place to take photos. All the pipes were insulated and then covered with bags of insulation. Finally I insulated the access hatches.

Underfloor insulation


Now the walls are finished it is time to do the floor.
The design means that I can cut small access hatches in the floor and then just get underneath the floor. I started by putting insulation between the joists and held it in with stapled skrim. This was very effective but a really horrible job as I only had a few inches to spare so my face was in mineral wool and it is difficult to work in those conditions with goggles and face mask. So we came up with cutting the insulation in 600mm lengths and put it in black bin bags and then stapled them in between the joists. which was much easier.

Monday 20 October 2008

The finished room



The wall was then reboarded, skim coated and painted. So £300 later the room looks exactly the same a before and £10.00 worth of insulation has been installed.
There is no way that this can be saved in the short or even medium term but the room will be more comfortable. It will be interesting to see how much difference it makes.

Electric back boxes



While the wall was down I replaced the the electrics with better wiring and fixing the back boxes.I put the back boxes so they stuck out a bit so that marking the plasterboards is easier. The wiring was fixed against the studs to prevent overheating.

Small cavities



There was some small voids above the window and I filled them Kingspan offcuts I found in a skip. I cut them just a little on the large side and then hammered them in so that there was no gaps (even small gaps can massively diminish the effectiveness of the insulation) I really cannot believe that the window needs that many 4 x 2s above the window.

Vapour barrier added




Once we had the insulation in we then installed the vapour barrier we are using a very thick polythene usually used for ground cover under foundations (I got it cheap at the local boot sale) The edges were stuck down with a thick layer of sealer and the stapled.The polythene being very thick is much less likely to tear. The difficult bit is sealing around the electrical sockets so I used a mixture of polythene sealer and gaffer tape.